East Lothian Council dropped kerbs: fee, who builds it and how to apply
East Lothian Council charges £62 to apply for a dropped kerb; building the crossing is extra. Source: East Lothian EIR 2026/ELF34871 reply, checked 11 November 2026. Everything you need to apply for a dropped kerb (vehicle crossing) with East Lothian Council, from the council's own website.
Last reviewed: Page updated: Edited by our editor
What our FOI request found
2023 to 2025 (as given in the reply).
74.7% of decided applications were approved
65 approved and 22 refused, 2023 to 2025 (as given)
- Applications received872023: 31 · 2024: 34 · 2025: 22
- Approved65of 87 decided
- Refused2225.3% of decided
| Year | Received | Approved | Refused | Refusal rate |
|---|---|---|---|---|
| 2023 | 31 | 23 | 8 | 26% |
| 2024 | 34 | 22 | 12 | 35% |
| 2025 | 22 | 20 | 2 | 9% |
Years 2023 to 2025, as given in the reply (it did not say whether those are calendar or financial years). Approved plus refused equals applications received each year. 22 refused of 87 decided = 25.3%. Refusal reasons named without counts: incorrect or insufficient documents submitted, planning permission required first, and a driveway of insufficient length. Decision times are not recorded (EIR regulation 10(4)(a)), so they are not shown as a speed figure. Fee: we show £62 for a Dropped Kerb Permit in 2026-2027, from the EIR 2026/ELF34871 reply; the council's drop-kerbs and permits pages still do not publish the amount.
Refusal rate 25.3% of decided applications (years 2023 to 2025 as given in the reply), ranked 83 of 101 councils (1 = lowest refusal rate) using the same method as our refusal rates by council.
East Lothian approved 74.7% of decided applications, 14.3 percentage points lower than the 89% across all 101 councils that have sent us usable figures so far. Councils count and record applications differently, so treat this as a rough guide, not a league table.
Why applications get refused here
- Submit the correct and complete documents first (a named reason).
- Check whether you need planning permission and get it first (a named reason).
- Measure the driveway: insufficient length was a named reason.
Source: Environmental Information Regulations (EIR) response from East Lothian Council, ref 2026/ELF34871, 11 November 2026. Figures only; the council's documents are not published here. Re-used under the Open Government Licence.
See how other councils compare · About our FOI data and download
Applying to East Lothian? Our free dropped kerb templates include a landlord consent letter, a site plan grid and an application checklist.
Not to be confused with. East Lothian Council doesn't cover every address nearby. These councils are separate highway authorities, with their own fees and rules: City of Edinburgh Council. Check your postcode.
Who builds dropped kerbs in East Lothian?
To drop a kerb in East Lothian you need the council's consent as Roads Authority, through a Road Excavation Permit. Applications are only accepted from the contractor doing the works, with NRSWA accreditation certificates for the works supervisor and operative and current public liability insurance.
Scotland has its own rules. Under section 56 of the Roads (Scotland) Act 1984, no works can be carried out in a public road without the roads authority's written consent, so East Lothian gives permission as the roads authority (often called a road opening permit or dropped kerb permit). England's Highways Act and planning rules don't apply in Scotland: ask East Lothian's planning team whether your driveway or access needs planning permission.
How much does a dropped kerb cost in East Lothian?
Homeowner application fee: £62. £62 Dropped Kerb Permit fee for 2026-2027, paid when the permit is issued (section 140, Roads (Scotland) Act 1984, site inspection charge). Source: the council's EIR 2026/ELF34871 reply (11 November 2026). The drop-kerbs and permits pages still do not publish the amount.
Total council fees: £62 (construction not included).
Building it: East Lothian doesn't publish a construction price. See typical build prices from councils that do.
Estimate your total for East Lothian with the calculator
East Lothian's total council fees are below the UK median of £250 across the 170 councils in our Dropped Kerb Fee Index 2026. For build prices and what pushes them up, read how much a dropped kerb costs.
Contractor requirements in East Lothian
- Applies for the Road Excavation Permit itself
- NRSWA accreditation for works supervisor and operative
- Current public liability insurance
How to check street works cards and insurance before you hire: our guide to dropped kerb contractors.
How to apply in East Lothian
- Check whether you need planning permission (classified road, listed building, flat or commercial premises, or change of use), so check with Planning Reception.
- Your contractor completes the council's permit application with drawings, photos, accreditation and insurance.
- Permits are usually issued within 4-6 weeks, with conditions and specifications. The 2026-27 Dropped Kerb Permit fee is £62, payable when the permit is issued.
Before you apply, check dropped kerb planning rules in Scotland, because the rules there differ from England's. Then use our guide to applying for a dropped kerb alongside East Lothian's own steps above.
How long does a dropped kerb take in East Lothian?
- Permits usually issued within 4-6 weeks.
Size and siting rules
- Driveway 6m long (5m absolute minimum).
- First 2 metres of the driveway surfaced with bound material; gates must open inwards.
These sit alongside the common dropped kerb size and siting rules.
Planning permission and extending a dropped kerb in East Lothian
Do I need planning permission for a dropped kerb in East Lothian? Possibly. East Lothian's guidance says: Check whether you need planning permission (classified road, listed building, flat or commercial premises, or change of use), so check with Planning Reception. Planning permission is separate from the dropped kerb permission. Planning permission guide.
Can I extend my dropped kerb in East Lothian? Yes, but only with East Lothian's permission, as for a new crossing. East Lothian doesn't publish separate rules or a fee for extensions. Widening guide.
Free templates for your East Lothian application
More templates
Ready to apply in East Lothian?
Check your property qualifies and have everything ready, then apply on the council's own website.
East Lothian: Drop kerbs Eligibility checker Printable checklist
Don’t want to do the paperwork? East Lothian application drawings, £129 (1:200 site plan + form answers; we submit where your council allows; council fees separate; cancel within 14 days).
Areas covered
The council area is made up of 6 council wards: Dunbar and East Linton; Haddington and Lammermuir; Musselburgh; North Berwick Coastal; Preston, Seton and Gosford; and Tranent, Wallyford and Macmerry.
Source: ONS Open Geography Portal, council wards (May 2025). Homes near a boundary can be in a neighbouring council, so check your postcode if you're not sure.
Nearby councils
- Midlothian Council: £137 total council fees, any qualified contractor
- Scottish Borders Council: £371 total council fees, council's own list only
- City of Edinburgh Council: £210 total council fees, any qualified contractor
Dropped kerb guides
Council fees compared, plus a cost calculator How to apply, step by step
Including Scotland, Wales and Northern Ireland Planning permission
The rules in Scotland, Wales and Northern Ireland Who builds a dropped kerb?
Council, its list or your own contractor Rules and sizes
Depth, junctions, trees and width Dropped kerb without permission
Including Scotland and Wales Choosing a contractor
Street works cards, insurance and red flags Is this fee fair?
Compare with the UK median and neighbours
Sources (official, checked 4 October 2026)