EV cable gully and cable channel: new UK rules for cross-pavement charging
Last reviewed: Page updated: Edited by our editor
New UK rules for cross-pavement EV charging cables came into force in England on 21 October 2026: an authorised cable gully or cable channel (a "cross-pavement solution") no longer needs a planning application in most places. If you don't have a driveway, you can usually only run a charging cable across the pavement through a channel your highway authority has authorised. This guide covers how cable gullies and cable channels work, the permission and licences you need, what affects the cost and the government grant. A cable gully is not a dropped kerb, and it does not let you drive across the pavement.
Verified: The Town and Country Planning (General Permitted Development) (England) (Amendment) (No. 2) Order 2026, SI 2026/1056. Made 25 September 2026, laid 30 September 2026, in force 21 October 2026.
On this page
- Planning rules (in force since 21 October 2026)
- What it doesn't change
- Cable channels in conservation areas
- What a cable gully is
- Cross-pavement charging: how it works
- How cable-channel and cable-gully products work
- Council permission and licences
- EV charging with no driveway: your options
- What a cable channel costs
- The on-street chargepoint grant
- Wales, Scotland and Northern Ireland
- Dropped kerb or cable channel?
What a cable gully is (and what an EV cable channel is)
A cable gully, EV cable gully or EV cable channel is the same type of product: a shallow channel or tray, cut into or laid on the pavement, that a charging cable sits in so it is not a trip hazard. Councils and manufacturers also call it a cross-pavement solution or a pavement cable channel. It is for charging a car parked on the street, from a point at the house, where you do not have a driveway. It is not a vehicle crossing, and you should not drive over it as if it were a dropped kerb.
Planning rules for EV cable channels (in force since 21 October 2026)
These changes to permitted development in England have been in force since 21 October 2026:
- New permitted development for cable channels. A new Class F in Part 9 of the GPDO allows the installation, alteration or replacement of a "cross-pavement solution" by, on behalf of, or with the authorisation of, a highway authority. A cross-pavement solution is defined as a pavement-embedded cable channel that lets an EV charging cable safely cross a footway from a home to a parked vehicle.
- Exclusions. The new right doesn't apply within a scheduled monument, within the curtilage of a listed building, or in a conservation area.
- Reinstatement. When the channel is no longer needed, it must be removed and the pavement reinstated as soon as reasonably practicable.
- Wall chargers without a driveway. Permitted development for a wall-mounted charger is extended from off-street parking areas to anywhere within the curtilage of a house or block of flats. Every wall charger under this right must be no more than 1.6 m above ground. For chargers outside an off-street parking area, there's a limit of 1 outlet and the right doesn't apply in a conservation area. If the wall is right next to the highway, it can't stick out more than 0.2 m and must leave at least 1.5 m of footway.
- The cable must use a channel. Where there's a footway between the charger and the car, the cable must cross it through an authorised cross-pavement solution while charging.
- A year's overlap. The order has a transitional rule: development that was permitted under the old Class D and E wording can still go ahead under it until the end of 20 October 2027.
Find your council
Fees, who builds it and the application link depend on your council. Enter your postcode to go straight to its page.
Most-searched councils:
Or browse dropped kerb fees for all 202 councils, with median fees by region. To see how one council compares, the UK Dropped Kerb Fee Index 2026 puts the median at £250 across 170 councils.
What it doesn't change
- You still need the highway authority. The planning right only applies to channels installed by the highway authority or with its authorisation. The Department for Transport's guidance says the decision to allow a cross-pavement solution in the public highway "rests with the relevant local authority". Ask your council whether, and how, it authorises them.
- Highway permissions still apply. The Government's response to the consultation says it won't remove the need for a section 50 street works licence (New Roads and Street Works Act 1991), and that installations stay subject to highway permissions, including section 178 permission under the Highways Act 1980. Only the planning application is removed.
- It's not a vehicle crossing. You still need a dropped kerb to drive onto your property. See how to apply.
- England only. The GPDO being amended is the England order. Wales, Scotland and Northern Ireland have their own rules (see below).
Pavement cable channels in conservation areas
The planning rules in force since 21 October 2026 give conservation areas less freedom, not more. Here's what the order itself says (SI 2026/1056, checked against its Explanatory Memorandum):
- The cable channel isn't permitted development in a conservation area. The new Class F right for cross-pavement solutions doesn't apply within a conservation area. It also doesn't apply within a scheduled monument or within the curtilage of a listed building.
- The home charger may not be either. The new right to put a wall charger (Class D) or a charging upstand (Class E) anywhere within the curtilage of a house or block of flats, rather than only on an off-street parking area, doesn't apply in a conservation area. A wall charger within an area lawfully used for off-street parking is still covered under the existing rules.
- So the planning shortcut doesn't help. In a conservation area, ask your local planning authority what consent the channel and the charger need before you order anything. The DfT guidance says that, outside permitted development, planning permission is needed for a private chargepoint serving on-street parking unless the council has a local development order. You still need the highway authority's agreement and a section 50 licence, as anywhere else.
Why the exclusion? The government's consultation response records concerns from respondents, including heritage organisations, about the effect on conservation areas and listed buildings, and says limitations for charge points will apply within conservation areas. To check whether your street is in a conservation area, look at your local planning authority's conservation area maps or ask its planning team.
Cross-pavement charging: how it works
"Cross-pavement charging" means charging an electric car parked on the street from a chargepoint at your home, with the cable crossing the footway safely. The Department for Transport and the Office for Zero Emission Vehicles describe the options in Cross-pavement solutions for charging electric vehicles (published 24 December 2024, England only).
- Cable channels ("gullies"). A narrow channel set into the pavement surface that holds the charging cable while the car charges. You take the cable out when you've finished. The guidance calls these the most common solution and says trials have taken place in several local authorities using different suppliers.
- Not cable covers or mats. Covers and mats laid on top of a cable aren't covered by the guidance, though councils may use it to decide whether to allow them. They don't count for the government grant either (see below).
- Why councils care. The guidance says a cable trailed loose across the pavement can be a trip hazard, especially for people with limited mobility or sight loss, and may amount to a breach of Part IX of the Highways Act 1980. A cable channel is designed to avoid that.
How cable-channel products work
Several companies make cable channels, and your council decides which products, if any, it allows. Two examples, described in the manufacturers' own words. We haven't tested them and we don't recommend any product:
- Kerbo Charge. The manufacturer says you check whether your council is on board, order online and it organises the permissions with the council. It says installation "can take under an hour". To charge, you lift the lid, feed your cable in, and remove it when you're done.
- Gul-e (by ODS). The manufacturer says its channel has no moving parts and needs no tools to use, and that a trained team can install it in around 2 hours.
Whichever product your council uses, the idea is the same: the channel sits flush with the pavement, the cable lies in it only while charging, and the chargepoint is on your property. Check with your council before you order anything, because in many areas the council or its chosen supplier has to install the channel.
Council permission and licences
For a channel in the public pavement, expect these steps. The details vary by council:
- Highway authority approval. In two-tier areas this is the county council, not the district. Use find your council to check who looks after your road. The DfT guidance asks councils to consider things like pavement width, on-street parking, other buried services and tree roots.
- Section 50 licence. The DfT guidance says anyone who isn't a statutory undertaker (such as a utility company) must get a section 50 licence from the highway authority to place apparatus in the street. The licence sets out who maintains the channel, who reinstates the pavement and who removes it when it's no longer needed. A temporary traffic order may also be needed while the work is done.
- Reinstatement standards. The pavement has to be put back to the Specification for the Reinstatement of Openings in Highways (SROH). DfT has published an SROH addendum for cross-pavement solutions, and the guidance says the reinstatement must be guaranteed for 2 years.
- Planning. Since 21 October 2026, an authorised channel and a qualifying wall charger can be permitted development in England (see above). Before then, the DfT guidance says planning permission is needed for a private chargepoint serving on-street parking unless the council has a local development order. Listed buildings and conservation areas still need checking with your planning authority.
- Your ongoing responsibilities. The guidance's examples include keeping the channel clear of leaves and grit, reporting damage, having public liability cover for your cable, and telling the council if you move.
The DfT guidance describes how some councils have run schemes. These examples date from December 2024, so check the council's current pages:
- Milton Keynes City Council: the resident pays a survey fee, the council's highways team grants permission and the resident pays a highways-approved contractor to install it. The council keeps maintenance liability for 3 years, then the resident can extend the permission for an annual fee.
- Nottinghamshire County Council: received LEVI pilot funding in January 2023 to trial up to 300 cable channels, covering the cost of installing the channels.
- Oxfordshire County Council: planned an in-house scheme where the council owns the channels, installed and maintained by its contractor, with a user licence for residents.
EV charging with no driveway: your options
- Make a driveway. If your front garden is deep enough to park in (most councils want 4.8 to 5 m), you can apply for a dropped kerb and use a normal driveway charger. See can I get a dropped kerb? and planning permission for a dropped kerb, and look up your council's fees first.
- A cable channel to on-street parking. If your council allows them and you can usually park outside your home. It doesn't reserve the space: anyone can still park there.
- Public chargers. Councils in England can use Local Electric Vehicle Infrastructure (LEVI) funding for local chargepoints. Your council's EV charging pages will show local plans.
Don't run a cable across the pavement without a channel your council has approved, even for a short time.
What a cable channel costs
There's no national price. What you pay depends on how your council runs its scheme, and we don't quote figures we haven't verified. Things to ask your council about:
- Who installs it. In some areas you pay a highways-approved contractor or the manufacturer; in others the council or its chosen supplier installs and owns the channel (see the council examples above).
- Council charges. Milton Keynes, for example, charged a survey fee and, after 3 years, an annual fee to extend the permission. A section 50 licence and any temporary traffic order may also carry charges.
- Funded pilots. Some councils have used government funding to cover installation, as Nottinghamshire's LEVI pilot did.
- The chargepoint itself. The grant below can cover 75% of the chargepoint, up to £500, if you're also installing a cross-pavement solution.
The on-street chargepoint grant
The EV Chargepoint Grant for Households with On-Street Parking gives 75% off the cost of buying and installing a chargepoint socket, up to £500, if you're also installing a cross-pavement solution. GOV.UK lists the closing date as 31 March 2027. To apply you need to own or rent the home you live in, have no off-street parking of your own, have adequate on-street parking, and have permission from your local highway authority for the cross-pavement solution. The chargepoint mustn't already be installed, because the grant can't be backdated. Temporary solutions such as cable covers or mats don't qualify. The grant is open in England, Wales, Scotland and Northern Ireland.
Wales, Scotland and Northern Ireland
The planning change in force since 21 October 2026 and the DfT cross-pavement guidance apply to England only. Road works are devolved. The guidance points people in Wales to Transport for Wales, in Scotland to the Scottish Road Works Commissioner (decisions are for the local roads authority), and in Northern Ireland to the Department for Infrastructure. Check with your local roads authority.
Dropped kerb or cable channel?
If you have room to park on your own property, a dropped kerb plus a driveway charger is usually the option councils already have processes for. If you don't have the depth, a cable channel to on-street parking may be the route, once your council offers it. Check whether a dropped kerb is likely, or find your council to see its rules.
Sources (official, checked 6 October 2026)
- SI 2026/1056: GPDO (England) (Amendment) (No. 2) Order 2026
- legislation.gov.uk: Explanatory Memorandum to SI 2026/1056
- GOV.UK (DfT): Changes to various permitted development rights for EV charging: government response (September 2026), PDF
- GOV.UK (DfT and OZEV): Cross-pavement solutions for charging electric vehicles (24 December 2024)
- GOV.UK Find a grant: EV Chargepoint Grant for Households with On-Street Parking (closes 31 March 2027)
- New Roads and Street Works Act 1991, section 50 (street works licences)
Manufacturer pages quoted above (not official sources, not an endorsement)