Essex County Council dropped kerbs: fee, who builds it and how to apply
Essex County Council charges £210.18 to apply for a dropped kerb (£360.18 in total council fees); building the crossing is extra. Source: Essex County Council website, checked 3 October 2026. Everything you need to apply for a dropped kerb (vehicle crossing) with Essex County Council, from the council's own website.
Last reviewed: Page updated: Edited by our editor
Apply for initial consent (Essex Highways)
What our FOI request found
Calendar years 2023 to 2025.
96.6% of decided applications were approved
2,432 approved and 86 refused, calendar years 2023 to 2025
- Applications received2,6722023: 947 · 2024: 797 · 2025: 928
- Approved2,432of 2,518 decided
- Refused863.4% of decided
| Year | Received | Approved | Refused | Refusal rate |
|---|---|---|---|---|
| 2023 | 947 | 889 | 8 | 1% |
| 2024 | 797 | 745 | 30 | 4% |
| 2025 | 928 | 798 | 48 | 6% |
Approved plus refused is below applications received (154 in total); those gaps are not treated as refused.
Calendar years 2023 to 2025. Applications received 947, 797 and 928; approved 889, 745 and 798; declined 8, 30 and 48 (2,672 received; 2,432 approved and 86 declined = 2,518 decided, 3.4%). Approved plus declined is below received (154 applications in total); those gaps are not treated as refused. The three most common reasons for declining, without counts: not having sufficient depth or width; already having the maximum number of dropped kerbs; not having enough distance between two crossings for in/out access. Decisions are usually made within 10 working days, which is a typical timeframe rather than a measured average. The reply pointed to the published fee page; this page already shows £210.18 plus a £150 road opening notice (ECC21433119).
Refusal rate 3.4% of decided applications (calendar years 2023 to 2025), ranked 20 of 101 councils (1 = lowest refusal rate) using the same method as our refusal rates by council.
Essex approved 96.6% of decided applications, 7.6 percentage points higher than the 89% across all 101 councils that have sent us usable figures so far. Councils count and record applications differently, so treat this as a rough guide, not a league table.
Why applications get refused here
- Measure the depth and width of the parking area: insufficient depth or width is a top named reason.
- Check whether you already have the maximum number of dropped kerbs.
- Leave enough space between two crossings if you want an in/out access.
Source: Freedom of Information response from Essex County Council, ref ECC21433119, 16 November 2026. Figures only; the council's documents are not published here. Re-used under the Open Government Licence.
See how other councils compare · About our FOI data and download
Applying to Essex? Our free dropped kerb templates include a landlord consent letter, a site plan grid and an application checklist.
Not to be confused with. Essex County Council doesn't cover every address nearby. These councils are separate highway authorities, with their own fees and rules: Southend-on-Sea City Council; Thurrock Council; London Borough of Havering; Redbridge Council. Some addresses in Havering and Redbridge still give "Essex" as the county, but those places are London boroughs, not part of Essex County Council. Check your postcode.
Who builds dropped kerbs in Essex?
Essex uses a two-stage process. You apply for consent; your chosen contractor then books the road space and builds the crossing. You may choose any suitably qualified contractor. Essex does not keep an approved list, but it checks the contractor's details before they may work on the highway and can refuse a contractor it considers not competent.
How much does a dropped kerb cost in Essex?
Homeowner application fee: £210.18. Non-refundable initial application fee (covers the site visit, a search for underground apparatus and admin). If approved, your contractor pays £150 for the Road Opening Notice. Vehicle crossing fees carry no VAT.
Road Opening Notice (paid by your contractor): £150
Total council fees: £360.18 (construction not included).
Building it: Essex doesn't publish a construction price. See typical build prices from councils that do.
Estimate your total for Essex with the calculator
Essex's total council fees are above the UK median of £250 across the 170 councils in our Dropped Kerb Fee Index 2026. For build prices and what pushes them up, read what a dropped kerb costs to build.
Contractor requirements in Essex
- Valid £10 million public liability insurance
- All site workers NRSWA-accredited to Operative level, with at least one Supervisor-level person on site or available at any time
- Prescribed PPE
How to check street works cards and insurance before you hire: our guide to dropped kerb contractors.
How to apply in Essex
- Check the criteria: a parking space at least 5 m deep (at about right angles to the road) by 2.5 m wide.
- Get planning permission first if you are on a classified road (A, B or Class III), and check local conditions such as covenants with your district council.
- Apply online for initial consent with a measured plan, any planning permission and the owner's written consent, and pay £210.18.
- Essex inspects, then requests details of underground utilities (a 'stats request'); the application is on hold until that comes back.
- Your contractor books the road space with a Road Opening Notice (£150) and builds the crossing within 6 months of approval.
- An inspector checks the finished crossing a few weeks later; the contractor fixes any defects.
Before you apply, check whether you need planning permission: it mostly depends on whether your road is classified. Then use our guide to applying for a dropped kerb alongside Essex's own steps above.
How long does a dropped kerb take in Essex?
- After preliminary consent the process 'can take several weeks'.
- Works must be completed within 6 months of approval, or you reapply.
Size and siting rules
- Parking space at least 5 m deep by 2.5 m wide; smaller spaces are refused and the fee is not refunded.
- Single crossing: 4 to 5 dropped kerbs (3.6 to 4.5 m) plus 2 ramp kerbs.
- A second crossing is only possible on unclassified roads, with 5 m of full-height kerb between the two.
- Gates must be at least 6 m from the edge of the highway.
- Mobility vehicle or motorbike access: no more than 1.8 m dropped.
These sit alongside the general dropped kerb rules. Every crossing in Essex needs the highway authority's consent under section 184 of the Highways Act 1980, and the council can act if a kerb is crossed or a crossing built without it: see the law on dropped kerbs.
Planning permission and extending a dropped kerb in Essex
Do I need planning permission for a dropped kerb in Essex? Possibly. Essex's guidance says: Get planning permission first if you are on a classified road (A, B or Class III), and check local conditions such as covenants with your district council. Planning permission is separate from the dropped kerb permission. Planning permission guide.
Can I extend my dropped kerb in Essex? Yes, but only with Essex's permission, as for a new crossing. Essex doesn't publish separate rules or a fee for extensions. Widening guide.
Good to know
- Harlow residents: most homes are covered by council covenants, so check Harlow Council's front garden parking consent first.
- Essex will not stop residents parking across a drive in a residents' parking area unless you pay for the legal order to be changed, with no guarantee of success.
No driveway but want to charge an electric car? Read about EV cable channels.
Free templates for your Essex application
More templates
Ready to apply in Essex?
Check your property qualifies and have everything ready, then apply on the council's own website.
Apply for initial consent (Essex Highways) Eligibility checker Printable checklist
Don’t want to do the paperwork? Essex application drawings, £129 (1:200 site plan + form answers; we submit where your council allows; council fees separate; cancel within 14 days).
Areas covered
Essex County Council is the highway authority across the county, which includes these district and borough council areas: Basildon, Braintree, Brentwood, Castle Point, Chelmsford, Colchester, Epping Forest, Harlow, Maldon, Rochford, Tendring and Uttlesford. The district and borough councils deal with planning applications; Essex County Council is the highway authority for public roads.
Main towns: Colchester; Basildon; Chelmsford; Harlow; Clacton-on-Sea; Brentwood; Thundersley and South Benfleet; Braintree; Canvey Island; Billericay; Loughton; and Rayleigh.
Source: ONS Open Geography Portal, local authority districts and counties (May 2025) and built-up areas (2022). Homes near a boundary can be in a neighbouring council, so check your postcode if you're not sure.
Nearby councils
- Southend-on-Sea City Council: £300 total council fees, council's own list only
- Thurrock Council: £375 total council fees, council builds
- Enfield Council: £301 total council fees, council builds
- London Borough of Havering: £261 total council fees, council builds
- Redbridge Council: £830 total council fees, council builds
Dropped kerb guides
Council fees compared, plus a cost calculator How to apply, step by step
Documents, timescales and refusals Do you need planning permission?
A quick decision flow for England Rules and sizes
Depth, junctions, trees and width How a dropped kerb is installed
Step-by-step cross-section, quote to sign-off Who builds a dropped kerb?
Council, its list or your own contractor Eligibility checker
Two-minute drive check EV charging cable channels
Pavement cable rules in force since 21 Oct 2026 Parking across a dropped kerb
Highway Code r243 and TMA s86 Is my road classified?
A, B and C roads need planning permission Section 184 and street works
Licences and contractor qualifications Dropped kerb without permission
The law, fines and putting it right Disabled access
Blue Badge discounts, grants and disabled bays Choosing a contractor
Street works cards, insurance and red flags Is this fee fair?
Compare with the UK median and neighbours
Sources (official, checked 3 October 2026)