Dropped Kerb Guide

Redbridge Council dropped kerbs: fee, who builds it and how to apply

Redbridge Council charges £454 to apply for a dropped kerb (£830 in total council fees); the council then quotes for building it. Source: Redbridge Council website, checked 3 October 2026. Everything you need to apply for a dropped kerb (vehicle crossing) with Redbridge Council, from the council's own website.

Last reviewed: Page updated: Edited by our editor

Homeowner application fee£454Fees shown on Redbridge's page on 3 Oct 2026
Total council fees£830Application fee plus other published council fees. Building it costs extra.
Who builds itCouncil buildsThe council builds it
Decision timeNot published
Permission valid forNot published

Apply for a dropped kerb (Redbridge)

What our FOI request found

Calendar years 2023 to 2025.

95.7%

95.7% of decided applications were approved
811 approved and 36 refused, calendar years 2023 to 2025

  • Applications received1,1892023: 472 · 2024: 341 · 2025: 376
  • Approved811of 847 decided
  • Refused364.3% of decided
YearReceivedApprovedRefusedRefusal rate
2023472344154%
2024341250145%
202537621773%

Approved plus refused is well below applications received each year (342 applications in total were not counted as approved or refused). Those gaps are not treated as refused.

Calendar years 2023 to 2025. Applications received 472, 341 and 376; approved 344, 250 and 217; refused 15, 14 and 7 (1,189 received; 811 approved and 36 refused = 847 decided, 4.3%). Approved plus refused is well below received each year (342 applications in total were not counted as approved or refused). Those gaps are not treated as refused. Reasons named without counts: grass verge, frontage size (minimum width), street tree, and traffic schemes (2024). The council did not give an average decision time; it said the process could take at least 12 weeks from start to finish, which is not shown as a speed figure. The reply pointed to Redbridge's dropped kerbs page for fees; this page already shows the £454 application and inspection fee and the £376 legal agreement (39295613).

Refusal rate 4.3% of decided applications (calendar years 2023-25), ranked 25 of 101 councils (1 = lowest refusal rate) using the same method as our refusal rates by council.

Redbridge approved 95.7% of decided applications, 6.7 percentage points higher than the 89% across all 101 councils that have sent us usable figures so far. Councils count and record applications differently, so treat this as a rough guide, not a league table.

Why applications get refused here

  • Check for a grass verge between the road and your frontage: verges were named every year.
  • Measure your frontage width against the council's minimum size first.
  • Look for a street tree near the crossing (a named reason).

Source: Freedom of Information response from London Borough of Redbridge, ref 39295613, 13 November 2026. Figures only; the council's documents are not published here. Re-used under the Open Government Licence.

Applying to Redbridge? Our free dropped kerb templates include a landlord consent letter, a site plan grid and an application checklist.

Not to be confused with. Addresses in places like Ilford, Woodford, Wanstead and Barkingside sometimes still say "Essex", but they're in Redbridge Council, a London borough. Essex County Council's fees and rules don't apply. Check your postcode.

Who builds dropped kerbs in Redbridge?

Redbridge creates the dropped kerb with its contractor once it has your payment and signed legal agreement. It only lowers the kerb: you arrange the driveway opening and a compliant permeable parking area first.

You don't need to find a contractor for the crossing. Redbridge builds dropped kerbs itself, so apply to the council and pay its quote. Use our printable checklist and timeline to get your application right first time. You can still choose your own builder for the driveway.

How much does a dropped kerb cost in Redbridge?

Homeowner application fee: £454. £454 non-refundable application and inspection fee. If approved, you also pay £376 for the legal agreement (that your vehicle won't overhang the footway). Revising a quotation costs £130.

Legal agreement (if approved): £376

Total council fees: £830 (plus the council's price for building it).

Building it: Redbridge doesn't publish a construction price. See typical build prices from councils that do.

Estimate your total for Redbridge with the calculator

Redbridge's total council fees are above the UK median of £250 across the 170 councils in our UK dropped kerb fee index. For build prices and what pushes them up, read how much a dropped kerb costs.

How to apply in Redbridge

  1. Get planning permission first if you're on a classified road, in a conservation area (with frontage works) or on a TfL red route (TfL's agreement too).
  2. Apply online with a Redbridge account and pay £454.
  3. Redbridge inspects; if approved, it sends a quotation and the legal agreement (£376).
  4. Sign the agreement and pay; build your front drive to the policy and send photos.
  5. Redbridge inspects the drive and programmes the crossing with its contractor.

Before you apply, check whether you need planning permission: it mostly depends on whether your road is classified. Then use our step-by-step dropped kerb application guide alongside Redbridge's own steps above.

How long does a dropped kerb take in Redbridge?

  • The process could take at least 12 weeks from start to finish. Redbridge's page notes a delay in processing applications.

These sit alongside the common dropped kerb size and siting rules. Every crossing in Redbridge needs the highway authority's consent under section 184 of the Highways Act 1980, and the council can act if a kerb is crossed or a crossing built without it: see the law on dropped kerbs.

Planning permission and extending a dropped kerb in Redbridge

Do I need planning permission for a dropped kerb in Redbridge? Possibly. Redbridge's guidance says: Get planning permission first if you're on a classified road, in a conservation area (with frontage works) or on a TfL red route (TfL's agreement too). Planning permission is separate from the dropped kerb permission. Planning permission guide.

Can I extend my dropped kerb in Redbridge? Yes, but only with Redbridge's permission, as for a new crossing. Redbridge doesn't publish separate rules or a fee for extensions. Widening guide.

Good to know

  • Mature street trees won't be removed; trees under 2 years old can be, at your cost.
  • Moving street lights or furniture, where possible, is at your cost.
  • You can ask for a review of the decision online.

No driveway but want to charge an electric car? Read about EV charging cable channels across the pavement.

Free templates for your Redbridge application

More templates

All free templates

Ready to apply in Redbridge?

Check your property qualifies and have everything ready, then apply on the council's own website.

Apply for a dropped kerb (Redbridge) Eligibility checker Printable checklist

Don’t want to do the paperwork? Redbridge application drawings, £129 (1:200 site plan + form answers; we submit where your council allows; council fees separate; cancel within 14 days).

Areas covered

The borough is made up of 22 council wards: Aldborough, Barkingside, Bridge, Chadwell, Churchfields, Clayhall, Clementswood, Cranbrook, Fairlop, Fullwell, Goodmayes, Hainault, Ilford Town, Loxford, Mayfield, Monkhams, Newbury, Seven Kings, South Woodford, Valentines, Wanstead Park and Wanstead Village.

Source: ONS Open Geography Portal, council wards (May 2025). Homes near a boundary can be in a neighbouring council, so check your postcode if you're not sure.

Nearby councils

Dropped kerb guides