Dropped kerbs in East Sussex County Council: fee, who builds it and how to apply

Everything you need to apply for a dropped kerb (vehicle crossing) with East Sussex County Council, from the council's own website. Last checked 3 October 2026.

Homeowner application fee£147East Sussex Highways licence fees (after the 1 April 2026 increase), checked 3 Oct 2026
Total council fees£412Application fee plus other published council fees. Building it costs extra.
Who builds itCouncil's own list onlyOnly contractors on the council's own list
Decision timeUp to 8 weeks
Permission valid for6 months

East Sussex Highways: Apply online (vehicle dropped crossing)

Check you have the right council. East Sussex County Council doesn't cover every address in the area. These neighbouring places have their own highway authority, with different fees and rules: Brighton & Hove City Council. Check your postcode.

Who builds dropped kerbs in East Sussex?

East Sussex Highways (the county council's highways service) uses a two-phase licence. You apply first (phase 1); if approved, you must appoint a contractor registered with Trading Standards' Buy With Confidence scheme, and the contractor applies for the phase 2 construction licence. You can't use your own contractor unless they're on that approved list.

How much does a dropped kerb cost in East Sussex?

Homeowner application fee: £147. Phase 1 homeowner licence fee (licence valid 6 months). Fees are paid in advance and aren't refunded, including if you're refused.

Phase 2 construction licence (your contractor applies): £265

Total council fees: £412 (construction not included).

Building it: East Sussex doesn't publish a typical construction price. Councils that do publish prices quote roughly £1,000 to £3,500 for a standard crossing.

Estimate your total for East Sussex with the calculator

Contractor requirements in East Sussex

How to check street works cards and insurance before you hire: our guide to dropped kerb contractors.

How to apply in East Sussex

  1. Check whether you need planning permission (classified A, B or C road, conservation area, or surface water not kept within your property) and get it first.
  2. Apply online for the phase 1 vehicle crossover licence and pay £147.
  3. An officer inspects; a decision can take up to 8 weeks. If approved, you get a licence valid for 6 months.
  4. Appoint a Buy With Confidence contractor from the approved list. They apply for the phase 2 construction licence (£265) with at least 14 days' notice.
  5. The contractor builds the crossing after your driveway is in place and maintains it for 12 months.

How long it takes

Size and siting rules

Good to know

Ready to apply in East Sussex?

Check your property qualifies and have everything ready, then apply on the council's own website.

East Sussex Highways: Apply online (vehicle dropped crossing) Eligibility checker Printable checklist