Dropped Kerb Guide

Hackney Council dropped kerbs: fee, who builds it and how to apply

Hackney Council charges £275 to apply for a dropped kerb; the council then quotes for building it. Source: Hackney Council website, checked 4 October 2026. Everything you need to apply for a dropped kerb (vehicle crossing) with Hackney Council, from the council's own website.

Last reviewed: Page updated: Edited by our editor

Homeowner application fee£275Fee shown on Hackney's pages on 4 Oct 2026
Total council fees£275No other council fees published. Building it costs extra.
Who builds itCouncil buildsThe council builds it
Decision timeNot published
Permission valid forNot published

Hackney: Dropped kerbs and vehicle crossovers

What our FOI request found

Calendar years 2023 to 2025.

38.9%

38.9% of decided applications were approved
7 approved and 11 refused, 2023 to 2025

  • Applications received292023: 9 · 2024: 10 · 2025: 10
  • Approved7of 18 decided
  • Refused1161.1% of decided
YearReceivedApprovedRefusedRefusal rate
202394233%
2024103350%
20251006100%

Calendar years 2023 to 2025. Approved plus refused (18) is below the 29 applications received; the remainder is presumably withdrawn, pending planning/parking bay removal, or still undecided. 11 refused = 61.1% of decided — not ranked nationally (under the 20-decision threshold). Refusal reasons named without counts. Decision times not held (outside factors such as planning and parking-bay removal). Fee £275 matches this page and the FOI figure (FOI 50903149).

Refusal rate 61.1% of decided applications (2023-25 calendar). Not ranked nationally because fewer than 20 decided applications were supplied.

Councils count and record applications differently; with a small number of decided applications this rate can swing sharply year to year.

Why applications get refused here

  • Measure parking depth first: a proposed parking depth under 4.8 m is the top refusal reason Hackney named.
  • Look for trees on the footway where the crossing would go.
  • Check the access is at least 2.4 m wide.

Source: Freedom of Information response from Hackney Council, ref 50903149, 6 November 2026. Figures only; the council's documents are not published here. Re-used under the Open Government Licence.

Applying to Hackney? Our free dropped kerb templates include a landlord consent letter, a site plan grid and an application checklist.

Who builds dropped kerbs in Hackney?

Make an enquiry first. If it meets Hackney's requirements you're sent an application form; a highways officer then measures up and you get a written quotation within 14 days.

You don't need to find a contractor for the crossing. Hackney builds dropped kerbs itself, so apply to the council and pay its quote. Use our printable checklist and timeline to get your application right first time. You can still choose your own builder for the driveway.

How much does a dropped kerb cost in Hackney?

Homeowner application fee: £275. Non-refundable payment with the application form, covering administration (consultations with utility companies and other departments).

Total council fees: £275 (plus the council's price for building it).

Building it: Hackney estimates the works at £2,500 to £7,000, depending on the footway material.

Estimate your total for Hackney with the calculator

Hackney's total council fees are above the UK median of £250 across the 170 councils in our UK council fee index. For build prices and what pushes them up, read what a dropped kerb costs to build.

How to apply in Hackney

  1. Make an enquiry online or by phone.
  2. If it meets the requirements, return the application form with the £275 fee.
  3. A highways officer visits; you get a written quotation within 14 days.

Before you apply, check whether you need planning permission: it mostly depends on whether your road is classified. Then use our guide to applying for a dropped kerb alongside Hackney's own steps above.

How long does a dropped kerb take in Hackney?

  • Written quotation within 14 days of the site visit.

Size and siting rules

  • Minimum opening of 2.4 metres and depth of 4.8 metres within the drive.

These sit alongside the general dropped kerb rules. Every crossing in Hackney needs the highway authority's consent under section 184 of the Highways Act 1980, and the council can act if a kerb is crossed or a crossing built without it: see the law on dropped kerbs.

Planning permission and extending a dropped kerb in Hackney

Do I need planning permission for a dropped kerb in Hackney? Possibly. Planning permission is separate from Hackney's dropped kerb permission. In England it's mainly needed on classified (A, B or C) roads, for flats, maisonettes and listed buildings, or where permitted development rights have been removed. Planning permission guide.

Can I extend my dropped kerb in Hackney? Yes, but only with Hackney's permission, as for a new crossing. Hackney doesn't publish separate rules or a fee for extensions. Widening guide.

No driveway but want to charge an electric car? Read about cross-pavement EV charging rules.

Free templates for your Hackney application

More templates

All free templates

Ready to apply in Hackney?

Check your property qualifies and have everything ready, then apply on the council's own website.

Hackney: Dropped kerbs and vehicle crossovers Eligibility checker Printable checklist

Don’t want to do the paperwork? Hackney application drawings, £129 (1:200 site plan + form answers; we submit where your council allows; council fees separate; cancel within 14 days).

Areas covered

The borough is made up of 21 council wards: Brownswood, Cazenove, Clissold, Dalston, De Beauvoir, Hackney Central, Hackney Downs, Hackney Wick, Haggerston, Homerton, Hoxton East & Shoreditch, Hoxton West, King's Park, Lea Bridge, London Fields, Shacklewell, Springfield, Stamford Hill West, Stoke Newington, Victoria and Woodberry Down.

Source: ONS Open Geography Portal, council wards (May 2025). Homes near a boundary can be in a neighbouring council, so check your postcode if you're not sure.

Nearby councils

Dropped kerb guides

Sources (official, checked 4 October 2026)