Dropped kerbs in Medway Council: fee, who builds it and how to apply
Everything you need to apply for a dropped kerb (vehicle crossing) with Medway Council, from the council's own website. Last checked 3 October 2026.
Medway: Apply to install or extend a dropped kerb
Check you have the right council. Medway Council doesn't cover every address in the area. These neighbouring places have their own highway authority, with different fees and rules: Kent County Council. Check your postcode.
Who builds dropped kerbs in Medway?
You can use Medway's Term Maintenance Contractor, Volker Highways (which quotes within 14 working days), or a contractor from Medway's approved list. You pay all construction costs.
How much does a dropped kerb cost in Medway?
Homeowner application fee: £450. Application fee for the site visit, inspection and outcome; not refunded if you're declined. With paid pre-application advice (£165, non-refundable), a successful applicant pays a reduced £285 to apply.
Total council fees: £450 (construction not included).
With pre-application advice: £165, then a reduced £285 application fee if favourable.
Building it: Medway doesn't publish a typical construction price. Councils that do publish prices quote roughly £1,000 to £3,500 for a standard crossing.
Estimate your total for Medway with the calculator
Contractor requirements in Medway
- Medway's term contractor (Volker Highways) or a contractor on Medway's approved list
How to check street works cards and insurance before you hire: our guide to dropped kerb contractors.
How to apply in Medway
- Read the guidance and complete the self-assessment checklist, or request pre-application advice (£165, site visit within 14 days).
- Apply online with photos of any trees, markings and utility covers, and pay £450 (or £285 after favourable pre-application advice).
- Medway visits the site and emails its decision, mostly within 14 days of the visit.
- If planning permission is needed, the application is put on hold until you have it.
- Use Volker Highways or an approved contractor, and pay the construction costs.
How long it takes
- Most decisions within 14 days of the site visit.
- Volker Highways quotes within 14 working days.
Size and siting rules
- At least 10 m from a junction.
- At least one metre from a streetlight or telegraph pole.
- Maximum dropped kerb length 5.6 m.
Good to know
- Medway no longer installs or repaints white keep-clear markings.
Ready to apply in Medway?
Check your property qualifies and have everything ready, then apply on the council's own website.
Medway: Apply to install or extend a dropped kerb Eligibility checker Printable checklist
Nearby councils
- Kent County Council: £500 total council fees, any qualified contractor
- Thurrock Council: £375 total council fees, council builds
- Southend-on-Sea City Council: £300 total council fees, council's own list only
Dropped kerb guides
Sources (official, checked 3 October 2026)