South Tyneside Council dropped kerb fee: No application fee (per council FOI reply, Nov 2026). Source: South Tyneside EIR 26.0960 reply, checked 10 November 2026. Everything you need to apply for a dropped kerb (vehicle crossing) with South Tyneside Council, from the council's own website.

Last reviewed: Page updated: Edited by our editor

Homeowner application feeNo application fee (per council FOI reply, Nov 2026)EIR 26.0960 reply, 10 November 2026: no charge to review an application; the dropped kerb page does not publish a fee
Total council feesNot publishedNo other council fees published. Building it costs extra.
Who builds itCouncil or your contractorCouncil or your own qualified contractor
Decision timeNot published
Permission valid forNot published

South Tyneside: Apply for a dropped kerb

What our FOI request found

Calendar years 2023 to 2025.

84.5%

84.5% of decided applications were approved
522 approved and 96 refused, 2023 to 2025

  • Applications received6382023: 134 · 2024: 165 · 2025: 339
  • Approved522of 618 decided
  • Refused9615.5% of decided
YearReceivedApprovedRefusedRefusal rate
20231341171612%
20241651352315%
20253392705717%

Calendar years 2023 to 2025. Approved plus refused is slightly below applications received each year (gaps 1, 7 and 12); the reply does not say what happened to the rest. 96 refused of 618 decided = 15.5%. Refusal reasons named without counts: insufficient garden depth or space for a vehicle, Tree Root Protection Area constraints, and utility apparatus conflicts. The council reported decision times of 27, 40 and 32 days for 2023, 2024 and 2025 without saying whether those are a mean or a median, or working or calendar days, so they are not shown as a measured speed figure. Fee: we show no application fee, from the EIR 26.0960 reply (no charge to review an access crossing application); the council's dropped kerb page still does not publish a fee.

Refusal rate 15.5% of decided applications (2023-25 calendar), ranked 69 of 101 councils (1 = lowest refusal rate) using the same method as our refusal rates by council.

South Tyneside approved 84.5% of decided applications, 4.5 percentage points lower than the 89% across all 101 councils that have sent us usable figures so far. Councils count and record applications differently, so treat this as a rough guide, not a league table.

Why applications get refused here

  • Measure the garden first: insufficient garden depth or space for a vehicle is a reason South Tyneside names.
  • Look for trees: Tree Root Protection Area constraints are a named reason.
  • Check for utility apparatus in the footway where the crossing would go.

Source: South Tyneside Council EIR response, ref EIR 26.0960, 10 November 2026. Figures only; reasons paraphrased; the council's documents are not published here.

Applying to South Tyneside? Our free dropped kerb templates include a landlord consent letter, a site plan grid and an application checklist.

Who builds dropped kerbs in South Tyneside?

Vehicle crossings in South Tyneside can be built either by the council or by a private contractor working to the council's specification. In all cases you need permission from the Highways and Infrastructure department.

How much does a dropped kerb cost in South Tyneside?

Homeowner application fee: No application fee (per council FOI reply, Nov 2026). The council's EIR 26.0960 reply (10 November 2026) says it does not currently charge a fee for an access crossing application to be reviewed. The dropped kerb page still does not publish a fee. Building the crossing is a separate cost.

Building it: South Tyneside doesn't publish a construction price. See typical build prices from councils that do.

Estimate your total for South Tyneside with the calculator

For typical build prices, read dropped kerb cost and price guide. Councils that publish every fee are compared in our UK dropped kerb fee index.

Contractor requirements in South Tyneside

  • Works to South Tyneside's specification
  • Permission from Highways and Infrastructure first

How to check street works cards and insurance before you hire: our guide to dropped kerb contractors.

How to apply in South Tyneside

  1. Check whether you need planning permission (classified road, listed building, or not a single-family house).
  2. Contact the council (Highways and Infrastructure) to apply.
  3. Have the crossing built by the council or a private contractor to the council's specification.

Before you apply, check dropped kerb planning rules: it mostly depends on whether your road is classified. Then use our how to apply for a dropped kerb alongside South Tyneside's own steps above.

Size and siting rules

  • Parking area at least 4.8 metres long and 2.4 metres wide.
  • Standard crossing 2.5 metres at the back of the footway and 5.4 metres at the kerb line.

These sit alongside the general dropped kerb rules. Every crossing in South Tyneside needs the highway authority's consent under section 184 of the Highways Act 1980, and the council can act if a kerb is crossed or a crossing built without it: see the law on dropped kerbs.

Planning permission and extending a dropped kerb in South Tyneside

Do I need planning permission for a dropped kerb in South Tyneside? Possibly. South Tyneside's guidance says: Check whether you need planning permission (classified road, listed building, or not a single-family house). Planning permission is separate from the dropped kerb permission. Planning permission guide.

Can I extend my dropped kerb in South Tyneside? Yes, but only with South Tyneside's permission, as for a new crossing. South Tyneside doesn't publish separate rules or a fee for extensions. Widening guide.

No driveway but want to charge an electric car? Read about EV charging cable channels across the pavement.

Free templates for your South Tyneside application

More templates

All free templates

Ready to apply in South Tyneside?

Check your property qualifies and have everything ready, then apply on the council's own website.

South Tyneside: Apply for a dropped kerb Eligibility checker Printable checklist

Don’t want to do the paperwork? South Tyneside application drawings, £129 (1:200 site plan + form answers; we submit where your council allows; council fees separate; cancel within 14 days).

Areas covered

Main towns: South Shields; Jarrow; Hebburn; East Boldon and West Boldon; Boldon Colliery; Whitburn; and Cleadon, plus smaller places nearby.

Source: ONS Open Geography Portal, built-up areas (2022), largest first. Homes near a boundary can be in a neighbouring council, so check your postcode if you're not sure.