Vale of Glamorgan Council dropped kerbs: fee, who builds it and how to apply
Vale of Glamorgan Council charges £280 to apply for a dropped kerb; building the crossing is extra. Source: Vale of Glamorgan Council website, checked 4 October 2026. Everything you need to apply for a dropped kerb (vehicle crossing) with Vale of Glamorgan Council, from the council's own website.
Last reviewed: Page updated: Edited by our editor
Vale of Glamorgan: Vehicle crossovers
What our FOI request found
Calendar years 2023 to 2025 (2023 from April).
89.4% of decided applications were approved
211 approved and 25 refused, 2023 to 2025 (2023 from April)
- Applications received2372023 (Apr–Dec): 70 · 2024: 96 · 2025: 71
- Approved211of 236 decided
- Refused2510.6% of decided
- Decision time5–14 calendar days (median per year)as reported by the council
| Year | Received | Approved | Refused | Refusal rate |
|---|---|---|---|---|
| 2023 (Apr–Dec) | 70 | 61 | 9 | 13% |
| 2024 | 96 | 81 | 15 | 16% |
| 2025 | 71 | 69 | 1 | 1% |
Calendar years 2023 to 2025, but 2023 covers April to December only (the officer's folder starts from April 2023). Approved plus refused equals applications received in 2023 and 2024; 2025 has a gap of 1. 25 refused of 236 decided = 10.6%. Refusal reasons named without counts: utility apparatus in the proposed location, planning-related issues or awaiting a planning decision, the proposal not meeting the council's specification, no response from the applicant, and the six-month validity period expiring before works started. Some of those may include lapsed or unanswered cases the council counted as refused. Median decision times 5, 14 and 7 calendar days. Fee £280 matches this page and the live vehicle-crossovers page (FOI 00211641).
Refusal rate 10.6% of decided applications (calendar years 2023-25 (2023 from April)), ranked 57 of 101 councils (1 = lowest refusal rate) using the same method as our refusal rates by council.
Vale of Glamorgan approved 89.4% of decided applications, about the same as the 89% across all 101 councils that have sent us usable figures so far. Councils count and record applications differently, so treat this as a rough guide, not a league table.
Why applications get refused here
- Check for utility apparatus where the crossing would go: apparatus in the proposed location is a reason the council named in 2023.
- If you need planning permission, get it first: planning-related issues or awaiting a planning decision were named every year.
- The proposal must meet the council's specification (named every year).
- Once approved, start the works within the six-month validity period (a 2024 reason).
Source: Freedom of Information response from Vale of Glamorgan Council, ref 00211641, 10 November 2026. Figures only; the council's documents are not published here. Re-used under the Open Government Licence.
See how other councils compare · About our FOI data and download
Applying to Vale of Glamorgan? Our free dropped kerb templates include a landlord consent letter, a site plan grid and an application checklist.
Not to be confused with. Vale of Glamorgan Council doesn't cover every address nearby. These councils are separate highway authorities, with their own fees and rules: Cardiff Council. Check your postcode.
Who builds dropped kerbs in Vale of Glamorgan?
The Vale of Glamorgan controls vehicle crossings under Section 184 of the Highways Act 1980 and charges £280 for a new or widened crossover. Its page also links to an application for approval to break into the public highway, but doesn't say who builds the crossing: ask networkmanagement@valeofglamorgan.gov.uk.
Wales has its own planning rules. Vehicle crossings in Wales come under section 184 of the Highways Act 1980, as in England, but permitted development rights are set by the Welsh Government, so England's planning guidance doesn't apply. See the Welsh Government's householder permitted development technical guide (PDF) or ask Vale of Glamorgan's planning team.
Who builds it isn't stated. Vale of Glamorgan's website doesn't say whether the council builds the crossing or you hire a contractor. Ask the council before you pay anyone, and check any contractor's street works qualifications and insurance.
How much does a dropped kerb cost in Vale of Glamorgan?
Homeowner application fee: £280. Fee for a new crossover or to widen an existing one.
Total council fees: £280 (construction not included).
Building it: Vale of Glamorgan doesn't publish a construction price. See typical build prices from councils that do.
Estimate your total for Vale of Glamorgan with the calculator
Vale of Glamorgan's total council fees are above the UK median of £250 across the 170 councils in our UK council fee index. For build prices and what pushes them up, read dropped kerb cost and price guide.
Contractor requirements in Vale of Glamorgan
- Not stated on the council's page: ask when you apply
How to check street works cards and insurance before you hire: our guide to dropped kerb contractors.
How to apply in Vale of Glamorgan
- On a classified road or in a conservation area you need planning consent.
- Apply to the council (£280), and ask networkmanagement@valeofglamorgan.gov.uk about building the crossing.
Before you apply, check whether you need planning permission in Wales, because the rules there differ from England's. Then use our step-by-step dropped kerb application guide alongside Vale of Glamorgan's own steps above.
These sit alongside the dropped kerb rules most UK councils use. Every crossing in Vale of Glamorgan needs the highway authority's consent under section 184 of the Highways Act 1980, and the council can act if a kerb is crossed or a crossing built without it: see the law on dropped kerbs.
Planning permission and extending a dropped kerb in Vale of Glamorgan
Do I need planning permission for a dropped kerb in Vale of Glamorgan? Possibly. Vale of Glamorgan's guidance says: On a classified road or in a conservation area you need planning consent. Planning permission is separate from the dropped kerb permission. Planning permission guide.
Can I extend my dropped kerb in Vale of Glamorgan? Yes, with Vale of Glamorgan's permission. From the council's information: Fee for a new crossover or to widen an existing one. Widening guide.
Free templates for your Vale of Glamorgan application
More templates
Ready to apply in Vale of Glamorgan?
Check your property qualifies and have everything ready, then apply on the council's own website.
Vale of Glamorgan: Vehicle crossovers Eligibility checker Printable checklist
Don’t want to do the paperwork? Vale of Glamorgan application drawings, £129 (1:200 site plan + form answers; we submit where your council allows; council fees separate; cancel within 14 days).
Areas covered
Main towns: Barry, Penarth, Dinas Powis, Rhoose, Llantwit Major, Cowbridge, Boverton and Eglwys-Brewis, plus smaller places nearby.
Source: ONS Open Geography Portal, built-up areas (2022), largest first. Homes near a boundary can be in a neighbouring council, so check your postcode if you're not sure.
Nearby councils
- Bridgend County Borough Council: £162.62 total council fees, any qualified contractor
- Cardiff Council: £263 total council fees, council builds
- Rhondda Cynon Taf County Borough Council: £152 total council fees, council or your contractor
Dropped kerb guides
Council fees compared, plus a cost calculator How to apply, step by step
Including Scotland, Wales and Northern Ireland Planning permission
The rules in Scotland, Wales and Northern Ireland Who builds a dropped kerb?
Council, its list or your own contractor Rules and sizes
Depth, junctions, trees and width Dropped kerb without permission
Including Scotland and Wales Choosing a contractor
Street works cards, insurance and red flags Is this fee fair?
Compare with the UK median and neighbours
Sources (official, checked 4 October 2026)