Dropped Kerb Guide

City of York Council dropped kerbs: fee, who builds it and how to apply

City of York Council charges £263 to apply for a dropped kerb; building the crossing is extra. Source: City of York Council website, checked 4 October 2026. Everything you need to apply for a dropped kerb (vehicle crossing) with City of York Council, from the council's own website.

Last reviewed: Page updated: Edited by our editor

Homeowner application fee£263Fee shown on York's pages on 4 Oct 2026
Total council fees£263No other council fees published. Building it costs extra.
Who builds itAny qualified contractorYour own qualified contractor
Decision timeNot published
Permission valid for12 months

York: Apply for a dropped kerb

No FOI data yet for York. We haven’t had usable approval and refusal figures from this council, so we don’t show an approval rate or estimate one. See the councils we have figures for.

Applying to York? Our free dropped kerb templates include a landlord consent letter, a site plan grid and an application checklist.

Not to be confused with. City of York Council doesn't cover every address nearby. These councils are separate highway authorities, with their own fees and rules: North Yorkshire Council. Check your postcode.

Who builds dropped kerbs in York?

Since 1 April 2022 you can choose any contractor, as long as they're suitably qualified: at least £5m public liability insurance, all site workers accredited under the New Roads and Street Works Act 1991 to Operative level, with at least one Supervisor available. You send their details to the council for checking first.

How much does a dropped kerb cost in York?

Homeowner application fee: £263. Invoiced only if permission is granted (non-refundable). A betterment-only application costs £131.50; a refused application is invoiced £63.

Total council fees: £263 (construction not included).

Building it: York doesn't publish a construction price. See typical build prices from councils that do.

Estimate your total for York with the calculator

York's total council fees are above the UK median of £250 across the 170 councils in our UK council fee index. For build prices and what pushes them up, read what a dropped kerb costs to build.

Contractor requirements in York

  • Public liability insurance of at least £5m
  • All site workers NRSWA accredited to Operative level, with at least one Supervisor on site or available
  • Returns a Contractor Permit Application (v-form) with the start date

How to check street works cards and insurance before you hire: our guide to dropped kerb contractors.

How to apply in York

  1. Check you're eligible and agree to York's terms and conditions; on a classified road get planning permission first.
  2. Apply online for a new vehicle crossing (neighbours sharing a crossing each apply separately).
  3. If permission is granted you're invoiced £263; if refused, £63.
  4. Within 12 months of the approval letter, your contractor returns the v-form with a start date, builds the crossing, and an inspector checks it afterwards.

Before you apply, check dropped kerb planning rules: it mostly depends on whether your road is classified. Then use our guide to applying for a dropped kerb alongside York's own steps above.

How long does a dropped kerb take in York?

  • If you haven't heard within 28 working days, contact the council.
  • Works must be completed within 12 months of the approval letter.

Size and siting rules

  • Parking space at least 6 m deep by 2.5 m wide (depth can be 5.5 m away from openings), or 3 m deep and 6 m wide for parallel parking.
  • At least 10 m from a junction.
  • At least 1 metre clearance from mature trees and 2 m from newly planted trees.
  • Standard single crossing: 3 flat and 2 dropped kerbs; maximum 5 flat and 2 dropped kerbs.

These sit alongside the common dropped kerb size and siting rules. Every crossing in York needs the highway authority's consent under section 184 of the Highways Act 1980, and the council can act if a kerb is crossed or a crossing built without it: see the law on dropped kerbs.

Planning permission and extending a dropped kerb in York

Do I need planning permission for a dropped kerb in York? Possibly. York's guidance says: Check you're eligible and agree to York's terms and conditions; on a classified road get planning permission first. Planning permission is separate from the dropped kerb permission. Planning permission guide.

Can I extend my dropped kerb in York? Yes, but only with York's permission, as for a new crossing. York doesn't publish separate rules or a fee for extensions. Widening guide.

Good to know

  • Mobility scooter or motorbike users can apply for a small dropped kerb of up to 1.8 m.

No driveway but want to charge an electric car? Read about cross-pavement EV charging rules.

Free templates for your York application

More templates

All free templates

Ready to apply in York?

Check your property qualifies and have everything ready, then apply on the council's own website.

York: Apply for a dropped kerb Eligibility checker Printable checklist

Don’t want to do the paperwork? York application drawings, £129 (1:200 site plan + form answers; we submit where your council allows; council fees separate; cancel within 14 days).

Areas covered

Main towns: York, Huntington, Haxby, Strensall, Upper Poppleton, Copmanthorpe, Dunnington and Bishopthorpe, plus smaller places nearby.

Source: ONS Open Geography Portal, built-up areas (2022), largest first. Homes near a boundary can be in a neighbouring council, so check your postcode if you're not sure.

Nearby councils

Other neighbouring councils we haven't checked yet (links to each council's dropped kerb page where we could find one): East Riding of Yorkshire (council website (dropped kerb page not yet checked)).

Dropped kerb guides