Falkirk Council charges £195.20 to apply for a dropped kerb; building the crossing is extra. Source: Falkirk Council website, checked 4 October 2026. Everything you need to apply for a dropped kerb (vehicle crossing) with Falkirk Council, from the council's own website.

Last reviewed: Page updated: Edited by our editor

Homeowner application fee£195.20Fee shown on Falkirk's pages on 4 Oct 2026
Total council fees£195.20No other council fees published. Building it costs extra.
Who builds itAny qualified contractorYour own qualified contractor
Decision timeNot published
Permission valid forNot published

Falkirk: Road permits

What our FOI request found

Calendar years 2023 to 2025.

90.1%

90.1% of decided applications were approved
163 approved and 18 refused, 2023-25

  • Applications received2482023: 18 · 2024: 110 · 2025: 120
  • Approved163of 181 decided
  • Refused189.9% of decided
YearReceivedApprovedRefusedRefusal rate
202318Not heldNot heldNot held
20241108478%
2025120791112%

Refusal rate 9.9% of decided applications (2024-25 (2023 not held)), ranked 52 of 101 councils (1 = lowest refusal rate) using the same method as our refusal rates by council.

Falkirk approved 90.1% of decided applications, 1.1 percentage points higher than the 89% across all 101 councils that have sent us usable figures so far. Councils count and record applications differently, so treat this as a rough guide, not a league table.

Source: Freedom of Information response from Falkirk Council, ref FOI-883029638, 27 October 2026. Figures only; the council's documents are not published here. Re-used under the Open Government Licence.

Applying to Falkirk? Our free dropped kerb templates include a landlord consent letter, a site plan grid and an application checklist.

Who builds dropped kerbs in Falkirk?

You need Minor Roadworks Consent from Falkirk Council (section 56, Roads (Scotland) Act 1984) to form a vehicular footway crossing. You choose and pay the contractor; Falkirk recommends one known to the council and can provide details of interested contractors on request.

Scotland has its own rules. Under section 56 of the Roads (Scotland) Act 1984, no works can be carried out in a public road without the roads authority's written consent, so Falkirk gives permission as the roads authority (often called a road opening permit or dropped kerb permit). England's Highways Act and planning rules don't apply in Scotland: ask Falkirk's planning team whether your driveway or access needs planning permission.

How much does a dropped kerb cost in Falkirk?

Homeowner application fee: £195.20. Section 56 Footway Crossing (dropped kerbs) fee, from Falkirk's road permits charges.

Total council fees: £195.20 (construction not included).

Building it: Falkirk doesn't publish a construction price. See typical build prices from councils that do.

Estimate your total for Falkirk with the calculator

Falkirk's total council fees are below the UK median of £250 across the 170 councils in our UK dropped kerb fee index. For build prices and what pushes them up, read dropped kerb cost and price guide.

Contractor requirements in Falkirk

  • Works to the conditions of the Minor Roadworks Consent
  • Falkirk recommends a contractor known to the council
  • 1 year maintenance (guarantee) period after completion

How to check street works cards and insurance before you hire: our guide to dropped kerb contractors.

How to apply in Falkirk

  1. If the crossing is onto an A, B or C class road, check planning permission first.
  2. Apply for Minor Roadworks Consent, before or after choosing a contractor, at least 14 days ahead (35 days if traffic-sensitive), with the £195.20 fee.
  3. Don't pay your contractor until the work is approved by the council.

Before you apply, check planning permission for a dropped kerb in Scotland, because the rules there differ from England's. Then use our how to apply for a dropped kerb alongside Falkirk's own steps above.

How long does a dropped kerb take in Falkirk?

  • Apply at least 14 days ahead (35 days at traffic-sensitive locations).

These sit alongside the general dropped kerb rules.

Planning permission and extending a dropped kerb in Falkirk

Do I need planning permission for a dropped kerb in Falkirk? Possibly. Falkirk's guidance says: If the crossing is onto an A, B or C class road, check planning permission first. Planning permission is separate from the dropped kerb permission. Planning permission guide.

Can I extend my dropped kerb in Falkirk? Yes, but only with Falkirk's permission, as for a new crossing. Falkirk doesn't publish separate rules or a fee for extensions. Widening guide.

Free templates for your Falkirk application

More templates

All free templates

Ready to apply in Falkirk?

Check your property qualifies and have everything ready, then apply on the council's own website.

Falkirk: Road permits Eligibility checker Printable checklist

Don’t want to do the paperwork? Falkirk application drawings, £129 (1:200 site plan + form answers; we submit where your council allows; council fees separate; cancel within 14 days).

Areas covered

The council area is made up of 9 council wards: Bo'ness and Blackness; Bonnybridge and Larbert; Carse, Kinnaird and Tryst; Denny and Banknock; Falkirk North; Falkirk South; Grangemouth; Lower Braes; and Upper Braes.

Source: ONS Open Geography Portal, council wards (May 2025). Homes near a boundary can be in a neighbouring council, so check your postcode if you're not sure.

Nearby councils

Dropped kerb guides