Stirling Council dropped kerbs: fee, who builds it and how to apply
Stirling Council charges £141 to apply for a dropped kerb; building the crossing is extra. Source: Stirling Council website, checked 4 October 2026. Everything you need to apply for a dropped kerb (vehicle crossing) with Stirling Council, from the council's own website.
Last reviewed: Page updated: Edited by our editor
Stirling: Vehicle footway crossing online form
What our FOI request found
2023 to 2025 (approved only). Partial reply: no approval rate, not ranked.
- Applications receivedNot heldtotal not recorded
- Approved2023: 58 · 2024: 63 · 2025: 42as counted by the council
- RefusedNot heldno approval rate
Years 2023 to 2025 as given in the reply (calendar or financial years not stated). Stirling answered under the Environmental Information (Scotland) Regulations: it does not hold the total number of applications received, and it does not keep records of refused applications, so received and refused figures are not held (regulation 10(4)(a)). Approved applications: 58 in 2023, 63 in 2024 and 42 in 2025. No approval rate and not ranked. The council said the reasons for refusal would typically include too little area for the driveway, an access at or too close to a bend, junction or pedestrian crossing, and street furniture in the way; these are not counted records. It gave an average processing time of 7 working days without saying whether that is a mean or a median, so it is not shown as a measured speed. Fee: the reply gives £152 and points to the council website, but the council's published page (checked 20 Nov 2026) shows £141, which is the figure on this page. EIR/202601862.
Partial data. Source: Freedom of Information response from Stirling Council, ref EIR/202601862, 20 November 2026.
Applying to Stirling? Our free dropped kerb templates include a landlord consent letter, a site plan grid and an application checklist.
Who builds dropped kerbs in Stirling?
You first need permission in principle from Stirling Council's Roads Authority. If it's given, you complete a Road Opening Application that includes your contractor's details.
Scotland has its own rules. Under section 56 of the Roads (Scotland) Act 1984, no works can be carried out in a public road without the roads authority's written consent, so Stirling gives permission as the roads authority (often called a road opening permit or dropped kerb permit). England's Highways Act and planning rules don't apply in Scotland: ask Stirling's planning team whether your driveway or access needs planning permission.
How much does a dropped kerb cost in Stirling?
Homeowner application fee: £141. Charge for the road opening application, paid by cash, cheque or card once Stirling has your form.
Total council fees: £141 (construction not included).
Building it: Stirling doesn't publish a construction price. See typical build prices from councils that do.
Estimate your total for Stirling with the calculator
Stirling's total council fees are below the UK median of £250 across the 170 councils in our UK council fee index. For build prices and what pushes them up, read what a dropped kerb costs to build.
Contractor requirements in Stirling
- Named on the Road Opening Application
How to check street works cards and insurance before you hire: our guide to dropped kerb contractors.
How to apply in Stirling
- Apply online for permission in principle, with your contact details, location, pictures and a sketch.
- Tenants need the landlord's permission; owners of former council homes need feu superior consent; on an A, B or Class III road you need planning permission.
- If permission in principle is given, complete the road opening application with your contractor's details and pay £141.
Before you apply, check planning permission for a dropped kerb in Scotland, because the rules there differ from England's. Then use our step-by-step dropped kerb application guide alongside Stirling's own steps above.
These sit alongside the general dropped kerb rules.
Planning permission and extending a dropped kerb in Stirling
Do I need planning permission for a dropped kerb in Stirling? Possibly. Stirling's guidance says: Tenants need the landlord's permission; owners of former council homes need feu superior consent; on an A, B or Class III road you need planning permission. Planning permission is separate from the dropped kerb permission. Planning permission guide.
Can I extend my dropped kerb in Stirling? Yes, but only with Stirling's permission, as for a new crossing. Stirling doesn't publish separate rules or a fee for extensions. Widening guide.
Free templates for your Stirling application
More templates
Ready to apply in Stirling?
Check your property qualifies and have everything ready, then apply on the council's own website.
Stirling: Vehicle footway crossing online form Eligibility checker Printable checklist
Don’t want to do the paperwork? Stirling application drawings, £129 (1:200 site plan + form answers; we submit where your council allows; council fees separate; cancel within 14 days).
Areas covered
The council area is made up of 7 council wards: Bannockburn; Dunblane and Bridge of Allan; Forth and Endrick; Stirling East; Stirling North; Stirling West; and Trossachs and Teith.
Source: ONS Open Geography Portal, council wards (May 2025). Homes near a boundary can be in a neighbouring council, so check your postcode if you're not sure.
Nearby councils
- Clackmannanshire Council: £51.40 total council fees, any qualified contractor
- Falkirk Council: £195.20 total council fees, any qualified contractor
- Argyll and Bute Council: £191 total council fees, any qualified contractor
- West Dunbartonshire Council: £214.60 total council fees, any qualified contractor
- East Dunbartonshire Council: £79 total council fees, any qualified contractor
Dropped kerb guides
Council fees compared, plus a cost calculator How to apply, step by step
Including Scotland, Wales and Northern Ireland Planning permission
The rules in Scotland, Wales and Northern Ireland Who builds a dropped kerb?
Council, its list or your own contractor Rules and sizes
Depth, junctions, trees and width Dropped kerb without permission
Including Scotland and Wales Choosing a contractor
Street works cards, insurance and red flags Is this fee fair?
Compare with the UK median and neighbours
Sources (official, checked 4 October 2026)