Clackmannanshire Council dropped kerbs: fee, who builds it and how to apply

Clackmannanshire Council charges £51.40 to apply for a dropped kerb; building the crossing is extra. Source: Clackmannanshire Council website, checked 4 October 2026. Everything you need to apply for a dropped kerb (vehicle crossing) with Clackmannanshire Council, from the council's own website.

Last reviewed: Page updated: Edited by our editor

Homeowner application fee£51.40Fee shown on Clackmannanshire's pages on 4 Oct 2026
Total council fees£51.40No other council fees published. Building it costs extra.
Who builds itAny qualified contractorYour own qualified contractor
Decision timeNot published
Permission valid forNot published

Clackmannanshire: Road permits and consents

What our FOI request found

Calendar years 2023 to 2025.

84.3%

84.3% of decided applications were approved
70 approved and 13 refused, 2023 to 2025

  • Applications received832023: 29 · 2024: 36 · 2025: 18
  • Approved70of 83 decided
  • Refused1315.7% of decided
YearReceivedApprovedRefusedRefusal rate
20232923621%
2024363338%
20251814422%

Calendar years 2023 to 2025. Approved plus refused equals applications received each year (83 decided; 13 refused = 15.7%). Refusal reasons with counts over the three years: insufficient parking depth or layout 8, loss of on-street parking or traffic impact 2, other 3. Decision times are not kept. The council charges no fee for the initial application; once it is approved you apply for Minor Roadworks Consent (footway crossing £51.40 from 1 April 2026, as on this page) (IR6435).

Refusal rate 15.7% of decided applications (2023-25 calendar), ranked 70 of 101 councils (1 = lowest refusal rate) using the same method as our refusal rates by council.

Clackmannanshire approved 84.3% of decided applications, 4.7 percentage points lower than the 89% across all 101 councils that have sent us usable figures so far. Councils count and record applications differently, so treat this as a rough guide, not a league table.

Why applications get refused here

  • Measure parking depth and layout first: insufficient parking depth or layout was the most common refusal reason (8 of 13 refusals in 2023-2025).
  • Think about on-street parking and traffic: loss of on-street parking or traffic impact accounted for 2 refusals.

Source: Freedom of Information response from Clackmannanshire Council, ref IR6435, 9 November 2026. Figures only; the council's documents are not published here. Re-used under the Open Government Licence.

Applying to Clackmannanshire? Our free dropped kerb templates include a landlord consent letter, a site plan grid and an application checklist.

Who builds dropped kerbs in Clackmannanshire?

Clackmannanshire no longer offers a service to do dropped crossing work. Your contractor needs Minor Roadworks Consent from the council as roads authority under section 56 of the Roads (Scotland) Act 1984, and must provide proof of at least £5 million public liability cover.

Scotland has its own rules. Under section 56 of the Roads (Scotland) Act 1984, no works can be carried out in a public road without the roads authority's written consent, so Clackmannanshire gives permission as the roads authority (often called a road opening permit or dropped kerb permit). England's Highways Act and planning rules don't apply in Scotland: ask Clackmannanshire's planning team whether your driveway or access needs planning permission.

How much does a dropped kerb cost in Clackmannanshire?

Homeowner application fee: £51.40. Footway Crossing – Minor Roadworks Consent, from the Roads and Transportation fee scale.

Total council fees: £51.40 (construction not included).

Building it: Clackmannanshire doesn't publish a construction price. See typical build prices from councils that do.

Estimate your total for Clackmannanshire with the calculator

Clackmannanshire's total council fees are below the UK median of £250 across the 170 councils in our Dropped Kerb Fee Index 2026. For build prices and what pushes them up, read what a dropped kerb costs to build.

Contractor requirements in Clackmannanshire

  • Minor Roadworks Consent (section 56, Roads (Scotland) Act 1984)
  • Public liability insurance of at least £5 million
  • Works to the council's Development Roads Guidelines and Specification
  • Signed to Chapter 8; 12-month defect liability period

How to check street works cards and insurance before you hire: our guide to dropped kerb contractors.

How to apply in Clackmannanshire

  1. Use the council's Dropped Footway Crossing online form (the council suggests the applicant is the contractor doing the work).
  2. Apply at least 14 days before the start date (1 month in traffic-sensitive situations), with drawings.
  3. Get utility plans through Dial before you Dig.
  4. Consent usually issues within 1-4 weeks; you may still need other permissions, such as planning.

Before you apply, check dropped kerb planning rules in Scotland, because the rules there differ from England's. Then use our step-by-step dropped kerb application guide alongside Clackmannanshire's own steps above.

How long does a dropped kerb take in Clackmannanshire?

  • Permits usually issued within 1-4 weeks.
  • Apply at least 14 days ahead (1 month if traffic-sensitive).

These sit alongside the dropped kerb rules most UK councils use.

Planning permission and extending a dropped kerb in Clackmannanshire

Do I need planning permission for a dropped kerb in Clackmannanshire? Possibly. Planning permission is separate from Clackmannanshire's dropped kerb permission, and Scotland has its own planning rules. Planning permission guide.

Can I extend my dropped kerb in Clackmannanshire? Yes, but only with Clackmannanshire's permission, as for a new crossing. Clackmannanshire doesn't publish separate rules or a fee for extensions. Widening guide.

Free templates for your Clackmannanshire application

More templates

All free templates

Ready to apply in Clackmannanshire?

Check your property qualifies and have everything ready, then apply on the council's own website.

Clackmannanshire: Road permits and consents Eligibility checker Printable checklist

Don’t want to do the paperwork? Clackmannanshire application drawings, £129 (1:200 site plan + form answers; we submit where your council allows; council fees separate; cancel within 14 days).

Areas covered

The council area is made up of 5 council wards: Clackmannanshire Central, Clackmannanshire East, Clackmannanshire North, Clackmannanshire South and Clackmannanshire West.