Dropped kerbs in Clackmannanshire Council: fee, who builds it and how to apply

Everything you need to apply for a dropped kerb (vehicle crossing) with Clackmannanshire Council, from the council's own website. Last checked 4 October 2026.

Homeowner application fee£51.40Fee shown on Clackmannanshire's pages on 4 Oct 2026
Total council fees£51.40No other council fees published. Building it costs extra.
Who builds itAny qualified contractorYour own qualified contractor
Decision timeNot published
Permission valid forNot published

Clackmannanshire: Road permits and consents

Who builds dropped kerbs in Clackmannanshire?

Clackmannanshire no longer offers a service to do dropped crossing work. Your contractor needs Minor Roadworks Consent from the council as roads authority under section 56 of the Roads (Scotland) Act 1984, and must provide proof of at least £5 million public liability cover.

Scotland has its own rules. Under section 56 of the Roads (Scotland) Act 1984, no works can be carried out in a public road without the roads authority's written consent, so Clackmannanshire gives permission as the roads authority (often called a road opening permit or dropped kerb permit). England's Highways Act and planning rules don't apply in Scotland: ask Clackmannanshire's planning team whether your driveway or access needs planning permission.

How much does a dropped kerb cost in Clackmannanshire?

Homeowner application fee: £51.40. Footway Crossing – Minor Roadworks Consent, from the Roads and Transportation fee scale.

Total council fees: £51.40 (construction not included).

Building it: Clackmannanshire doesn't publish a typical construction price. Councils that do publish prices quote roughly £1,000 to £3,500 for a standard crossing.

Estimate your total for Clackmannanshire with the calculator

Contractor requirements in Clackmannanshire

How to check street works cards and insurance before you hire: our guide to dropped kerb contractors.

How to apply in Clackmannanshire

  1. Use the council's Dropped Footway Crossing online form (the council suggests the applicant is the contractor doing the work).
  2. Apply at least 14 days before the start date (1 month in traffic-sensitive situations), with drawings.
  3. Get utility plans through Dial before you Dig.
  4. Consent usually issues within 1-4 weeks; you may still need other permissions, such as planning.

How long it takes

Ready to apply in Clackmannanshire?

Check your property qualifies and have everything ready, then apply on the council's own website.