Moray Council dropped kerbs: fee, who builds it and how to apply
Moray Council charges £195 to apply for a dropped kerb; building the crossing is extra. Source: Moray Council website, checked 4 October 2026. Everything you need to apply for a dropped kerb (vehicle crossing) with Moray Council, from the council's own website.
Last reviewed: Page updated: Edited by our editor
What our FOI request found
Calendar years 2023 to 2025 (refusals not held). Partial reply: no approval rate, not ranked.
- Applications received1162023: 28 · 2024: 37 · 2025: 51
- Approved2023: 28 · 2024: 37 · 2025: 51as counted by the council
- RefusedNot heldno approval rate
Calendar years 2023 to 2025. Applications received and approved were both given as 28 in 2023 (the reply notes that 2 were abandoned), 37 in 2024 and 51 in 2025. Those 2023 figures are shown as written and are not adjusted. Refused counts, reasons and decision times are not held (FOISA section 17), so there is no approval rate and the council is not ranked. The reply attached the council's standing charges from 1 April 2026; this page already shows the £195 Minor Works road opening permit from that list. Figures from the reply are credited to the council and are not re-licensed by us (FOISA 101004076544).
Partial data. Source: Moray Council FOI response, ref 101004076544, 16 November 2026. Figures only; the council's documents are not published here.
Applying to Moray? Our free dropped kerb templates include a landlord consent letter, a site plan grid and an application checklist.
Who builds dropped kerbs in Moray?
In Moray a road opening permit covers dropped kerbs. You apply with the correct fee before any digging, and your contractor must hold public liability insurance and a current SWQR card; the council attaches an abridged list of contractors it knows meet this, though others may be available.
Scotland has its own rules. Under section 56 of the Roads (Scotland) Act 1984, no works can be carried out in a public road without the roads authority's written consent, so Moray gives permission as the roads authority (often called a road opening permit or dropped kerb permit). England's Highways Act and planning rules don't apply in Scotland: ask Moray's planning team whether your driveway or access needs planning permission.
How much does a dropped kerb cost in Moray?
Homeowner application fee: £195. Road opening permit, Minor Works, from Moray's standing charges from 1 April 2026 (7 working days' notice). Standard Works permits are £350 (11 working days' notice): check which applies when you apply.
Total council fees: £195 (construction not included).
Building it: Moray doesn't publish a construction price. See typical build prices from councils that do.
Estimate your total for Moray with the calculator
Moray's total council fees are below the UK median of £250 across the 170 councils in our Dropped Kerb Fee Index 2026. For build prices and what pushes them up, read how much a dropped kerb costs.
Contractor requirements in Moray
- Public liability insurance
- Current SWQR (Street Works Qualification Register) card
- Abridged list of known contractors supplied; others may be used
How to check street works cards and insurance before you hire: our guide to dropped kerb contractors.
How to apply in Moray
- Complete the road opening permit application form.
- Submit it with the correct fee to roadspermits@moray.gov.uk, allowing the notice period on the form.
- Your SWQR-carded, insured contractor does the work once the permit is issued.
Before you apply, check dropped kerb planning rules in Scotland, because the rules there differ from England's. Then use our how to apply for a dropped kerb alongside Moray's own steps above.
How long does a dropped kerb take in Moray?
- Minor Works: 7 working days' notice; Standard Works: 11 working days' notice.
These sit alongside the dropped kerb rules most UK councils use.
Planning permission and extending a dropped kerb in Moray
Do I need planning permission for a dropped kerb in Moray? Possibly. Planning permission is separate from Moray's dropped kerb permission, and Scotland has its own planning rules. Planning permission guide.
Can I extend my dropped kerb in Moray? Yes, but only with Moray's permission, as for a new crossing. Moray doesn't publish separate rules or a fee for extensions. Widening guide.
Free templates for your Moray application
More templates
Ready to apply in Moray?
Check your property qualifies and have everything ready, then apply on the council's own website.
Moray: Road openings Eligibility checker Printable checklist
Don’t want to do the paperwork? Moray application drawings, £129 (1:200 site plan + form answers; we submit where your council allows; council fees separate; cancel within 14 days).
Areas covered
The council area is made up of 8 council wards: Buckie; Elgin City North; Elgin City South; Fochabers Lhanbryde; Forres; Heldon and Laich; Keith and Cullen; and Speyside Glenlivet.
Source: ONS Open Geography Portal, council wards (May 2025). Homes near a boundary can be in a neighbouring council, so check your postcode if you're not sure.
Nearby councils
- The Highland Council: £187 total council fees, any qualified contractor
- Aberdeenshire Council: £152.85 total council fees, any qualified contractor
- Aberdeen City Council: £92 total council fees, council builds
Dropped kerb guides
Council fees compared, plus a cost calculator How to apply, step by step
Including Scotland, Wales and Northern Ireland Planning permission
The rules in Scotland, Wales and Northern Ireland Who builds a dropped kerb?
Council, its list or your own contractor Rules and sizes
Depth, junctions, trees and width Dropped kerb without permission
Including Scotland and Wales Choosing a contractor
Street works cards, insurance and red flags Is this fee fair?
Compare with the UK median and neighbours
Sources (official, checked 4 October 2026)