Dropped Kerb Guide

Aberdeen City Council dropped kerbs: fee, who builds it and how to apply

Aberdeen City Council charges £92 to apply for a dropped kerb; the council then quotes for building it. Source: Aberdeen City Council EIR reply FOI-883564269, checked 13 November 2026. Everything you need to apply for a dropped kerb (vehicle crossing) with Aberdeen City Council, from the council's own website.

Last reviewed: Page updated: Edited by our editor

Homeowner application fee£92EIR FOI-883564269, 13 November 2026
Total council fees£92No other council fees published. Building it costs extra.
Who builds itCouncil buildsThe council builds it
Decision timeNot published
Permission valid forNot published

Aberdeen City: Installing a driveway process

What our FOI request found

2023 to 2025 (as given in the reply; calendar or financial not stated).

74.5%

74.5% of decided applications were approved
146 approved and 50 refused, 2023 to 2025 (as given)

  • Applications received2252023: 73 · 2024: 87 · 2025: 65
  • Approved146of 196 decided
  • Refused5025.5% of decided
YearReceivedApprovedRefusedRefusal rate
202373471625%
202487522230%
202565471220%

Years as given in the reply (calendar or financial not stated). Approved plus refused is below applications received each year (29 in total); those gaps are not treated as refused.

Years 2023 to 2025, as given in the reply. Applications received 73, 87 and 65; approved 47, 52 and 47; refused 16, 22 and 12 (225 received; 146 approved and 50 refused = 196 decided, 25.5%). Approved plus refused is below received each year (29 applications in total); those gaps are not treated as refused. Most common refusal reasons across the three years: full planning permission required instead of footway crossing permission 17; driveway dimensions below the minimum standards 11; road safety concerns 7. The council gave average times of 16, 6 and 10 days (unit and average type not stated) but said the figure is somewhat meaningless because most applications wait for further information from the applicant, so it is not shown as a speed figure. The reply gives the current application fee as £92, which this page now shows; before this reply the page said no fee was published (EIR FOI-883564269).

Refusal rate 25.5% of decided applications (years 2023-25 as given in the reply), ranked 84 of 101 councils (1 = lowest refusal rate) using the same method as our refusal rates by council.

Aberdeen approved 74.5% of decided applications, 14.5 percentage points lower than the 89% across all 101 councils that have sent us usable figures so far. Councils count and record applications differently, so treat this as a rough guide, not a league table.

Why applications get refused here

  • Check whether you need full planning permission first: the most common recorded reason (17 cases).
  • Measure the driveway against the minimum dimensions on the application (11 cases).
  • Think about road safety at the access point (7 cases).

Source: Environmental Information Regulations (EIR) response from Aberdeen City Council, ref FOI-883564269, 13 November 2026. Figures only; the council's documents are not published here. Re-used under the Open Government Licence.

Applying to Aberdeen? Our free dropped kerb templates include a landlord consent letter, a site plan grid and an application checklist.

Not to be confused with. Aberdeen City Council doesn't cover every address nearby. These councils are separate highway authorities, with their own fees and rules: Aberdeenshire Council. Check your postcode.

Who builds dropped kerbs in Aberdeen?

All approved driveways with footway access in Aberdeen must have a council-constructed footway crossing, paid for by you. The work on the public footpath is done by the council's appointed contractor, selected annually by competitive tender; you pay before construction.

Scotland has its own rules. Under section 56 of the Roads (Scotland) Act 1984, no works can be carried out in a public road without the roads authority's written consent, so Aberdeen gives permission as the roads authority (often called a road opening permit or dropped kerb permit). England's Highways Act and planning rules don't apply in Scotland: ask Aberdeen's planning team whether your driveway or access needs planning permission.

You don't need to find a contractor for the crossing. Aberdeen builds dropped kerbs itself, so apply to the council and pay its quote. Use our printable checklist and timeline to get your application right first time. You can still choose your own builder for the driveway.

How much does a dropped kerb cost in Aberdeen?

Homeowner application fee: £92. Application fee of £92 (from the council's EIR reply FOI-883564269, 13 November 2026). If approved, Aberdeen arranges a detailed estimate for the footway crossing work, which you pay before construction. The council's driveway page did not publish a fee when we checked it.

Total council fees: £92 (plus the council's price for building it).

Building it: Aberdeen doesn't publish a construction price. See typical build prices from councils that do.

Estimate your total for Aberdeen with the calculator

Aberdeen's total council fees are below the UK median of £250 across the 170 councils in our UK dropped kerb fee index. For build prices and what pushes them up, read what a dropped kerb costs to build.

How to apply in Aberdeen

  1. Council tenants need Sales and Consents Unit approval; housing association tenants need the association's consent.
  2. Check whether you need planning permission (flats, over 0.5m excavation or infill, grass verge over 2.5 metres, classified road, listed building or conservation area).
  3. Apply; Aberdeen aims to review applications within 20 working days, and the whole process can take 10-12 weeks.
  4. If approved, build your parking area, then pay the estimate before the council's contractor builds the crossing.

Before you apply, check whether you need planning permission in Scotland, because the rules there differ from England's. Then use our guide to applying for a dropped kerb alongside Aberdeen's own steps above.

How long does a dropped kerb take in Aberdeen?

  • Applications reviewed within 20 working days (aim).
  • Whole process up to 10-12 weeks.

Size and siting rules

  • Parking area 3 by 5 metres; driveway at least 5 metres long (6 metres to a garage or door).
  • Standard crossing 3 dropped kerbs (2.7 metres), up to 5 (4.5 metres).

These sit alongside the general dropped kerb rules.

Planning permission and extending a dropped kerb in Aberdeen

Do I need planning permission for a dropped kerb in Aberdeen? Possibly. Aberdeen's guidance says: Check whether you need planning permission (flats, over 0.5m excavation or infill, grass verge over 2.5 metres, classified road, listed building or conservation area). Planning permission is separate from the dropped kerb permission. Planning permission guide.

Can I extend my dropped kerb in Aberdeen? Yes, but only with Aberdeen's permission, as for a new crossing. Aberdeen doesn't publish separate rules or a fee for extensions. Widening guide.

Free templates for your Aberdeen application

More templates

All free templates

Ready to apply in Aberdeen?

Check your property qualifies and have everything ready, then apply on the council's own website.

Aberdeen City: Installing a driveway process Eligibility checker Printable checklist

Don’t want to do the paperwork? Aberdeen application drawings, £129 (1:200 site plan + form answers; we submit where your council allows; council fees separate; cancel within 14 days).

Areas covered

The council area is made up of 13 council wards: Airyhall/Broomhill/Garthdee, Bridge of Don, Dyce/Bucksburn/Danestone, George St/Harbour, Hazlehead/Queens Cross/Countesswells, Hilton/Woodside/Stockethill, Kincorth/Nigg/Cove, Kingswells/Sheddocksley/Summerhill, Lower Deeside, Midstocket/Rosemount, Northfield/Mastrick North, Tillydrone/Seaton/Old Aberdeen and Torry/Ferryhill.

Source: ONS Open Geography Portal, council wards (May 2025). Homes near a boundary can be in a neighbouring council, so check your postcode if you're not sure.

Nearby councils

Dropped kerb guides

Sources (official, checked 4 October 2026)