Trafford Council dropped kerbs: fee, who builds it and how to apply
Trafford Council charges £60.38 to apply for a dropped kerb; building the crossing is extra. Source: Trafford Council website, checked 4 October 2026. Everything you need to apply for a dropped kerb (vehicle crossing) with Trafford Council, from the council's own website.
Last reviewed: Page updated: Edited by our editor
Fee conflict on the council's own website: Trafford's dropped kerb page says the assessment deposit is £60.38, but its online payment page says £60.30.
Trafford: Dropped kerbs, request an assessment
What our FOI request found
Financial years April to March (2023-24 to 2025-26).
88.6% of decided applications were approved
443 approved and 57 refused, FY 2023-24 to 2025-26
- Applications received5212023-24: 183 · 2024-25: 162 · 2025-26: 176
- Approved443of 500 decided
- Refused5711.4% of decided
| Year | Received | Approved | Refused | Refusal rate |
|---|---|---|---|---|
| 2023-24 | 183 | 156 | 20 | 11% |
| 2024-25 | 162 | 138 | 18 | 12% |
| 2025-26 | 176 | 149 | 19 | 11% |
Financial years 2023-24 to 2025-26. 21 applications were cancelled or have no recorded outcome; those are not treated as refused.
Financial years 2023-24 to 2025-26. Applications received 183, 162 and 176; approved 156, 138 and 149; refused 20, 18 and 19 (521 received; 443 approved and 57 refused = 500 decided, 11.4%). A further 10 applications were cancelled and 11 had no recorded outcome; those are not treated as refused. Refusal reasons with counts: insufficient space 33; tree issue 3; planning rejected 1; not recorded 20. Decision times are not held (status dates are updated manually). The reply gives the assessment deposit as £60.30; this page shows £60.38 from the council's dropped kerb page, which already conflicts with its payment page (£60.30). Construction is priced individually (FOI 4467).
Refusal rate 11.4% of decided applications (FY 2023-24 to 2025-26), ranked 58 of 101 councils (1 = lowest refusal rate) using the same method as our refusal rates by council.
Trafford approved 88.6% of decided applications, about the same as the 89% across all 101 councils that have sent us usable figures so far. Councils count and record applications differently, so treat this as a rough guide, not a league table.
Why applications get refused here
- Make sure there is enough space for the parking area: insufficient space was the most common recorded reason (33 cases).
- Look for a tree near the crossing (3 cases).
- If you need planning permission, get it first (1 case was refused for planning).
Source: Trafford Council FOI response, ref 4467, 13 November 2026. Figures only; reasons paraphrased; the council's documents are not published here.
See how other councils compare · About our FOI data and download
Applying to Trafford? Our free dropped kerb templates include a landlord consent letter, a site plan grid and an application checklist.
Who builds dropped kerbs in Trafford?
Trafford's highways team (with Amey) assesses and prices your crossing and can build it. Once your application is approved you can use another provider, who must apply for a Section 50 licence with proof of street works accreditations and at least £5million public liability insurance.
How much does a dropped kerb cost in Trafford?
Homeowner application fee: £60.38. Deposit for an assessment (administration and a site visit). Deducted from the final cost if Trafford builds it; not refunded once the team has visited.
Total council fees: £60.38 (construction not included).
Building it: Trafford doesn't publish a construction price. See typical build prices from councils that do.
Estimate your total for Trafford with the calculator
Trafford's total council fees are below the UK median of £250 across the 170 councils in our Dropped Kerb Fee Index 2026. For build prices and what pushes them up, read how much a dropped kerb costs.
Contractor requirements in Trafford
- Section 50 street works licence from the council
- Required Street Works Accreditations
- Public liability insurance of at least £5million
How to check street works cards and insurance before you hire: our guide to dropped kerb contractors.
How to apply in Trafford
- Check the criteria (on a classified road or for commercial or apartment buildings other rules apply).
- Request an assessment and pay the deposit.
- The team visits and prices your crossing, aiming to finish within 4 weeks.
- If approved, pay the quotation up front for Trafford to build it within eight weeks, or use another provider with a Section 50 licence.
Before you apply, check dropped kerb planning rules: it mostly depends on whether your road is classified. Then use our step-by-step dropped kerb application guide alongside Trafford's own steps above.
How long does a dropped kerb take in Trafford?
- Assessment within 4 weeks (aim).
- Council works within eight weeks of approval.
Size and siting rules
- Driveway at least 5 metres deep from where it meets the pavement and at least 3.1 metres wide.
- Gradient less than 10%.
These sit alongside the common dropped kerb size and siting rules. Every crossing in Trafford needs the highway authority's consent under section 184 of the Highways Act 1980, and the council can act if a kerb is crossed or a crossing built without it: see the law on dropped kerbs.
Planning permission and extending a dropped kerb in Trafford
Do I need planning permission for a dropped kerb in Trafford? Possibly. Planning permission is separate from Trafford's dropped kerb permission. In England it's mainly needed on classified (A, B or C) roads, for flats, maisonettes and listed buildings, or where permitted development rights have been removed. Planning permission guide.
Can I extend my dropped kerb in Trafford? Yes, but only with Trafford's permission, as for a new crossing. Trafford doesn't publish separate rules or a fee for extensions. Widening guide.
No driveway but want to charge an electric car? Read about cross-pavement EV charging rules.
Free templates for your Trafford application
More templates
Ready to apply in Trafford?
Check your property qualifies and have everything ready, then apply on the council's own website.
Trafford: Dropped kerbs, request an assessment Eligibility checker Printable checklist
Don’t want to do the paperwork? Trafford application drawings, £129 (1:200 site plan + form answers; we submit where your council allows; council fees separate; cancel within 14 days).
Areas covered
Main towns: Sale, Altrincham, Urmston, Stretford, Old Trafford, Hale, Partington and Bowdon, plus smaller places nearby.
Source: ONS Open Geography Portal, built-up areas (2022), largest first. Homes near a boundary can be in a neighbouring council, so check your postcode if you're not sure.
Nearby councils
- Warrington Borough Council: Not published, council or your contractor
- Cheshire East Council: £500 total council fees, any qualified contractor
- Manchester City Council: No separate fee listed, council builds
- Salford City Council: £103.80 + an unpublished fee total council fees, council's own list only
Dropped kerb guides
Council fees compared, plus a cost calculator How to apply, step by step
Documents, timescales and refusals Do you need planning permission?
A quick decision flow for England Rules and sizes
Depth, junctions, trees and width How a dropped kerb is installed
Step-by-step cross-section, quote to sign-off Who builds a dropped kerb?
Council, its list or your own contractor Eligibility checker
Two-minute drive check EV charging cable channels
Pavement cable rules in force since 21 Oct 2026 Parking across a dropped kerb
Highway Code r243 and TMA s86 Is my road classified?
A, B and C roads need planning permission Section 184 and street works
Licences and contractor qualifications Dropped kerb without permission
The law, fines and putting it right Disabled access
Blue Badge discounts, grants and disabled bays Choosing a contractor
Street works cards, insurance and red flags Is this fee fair?
Compare with the UK median and neighbours