Dropped Kerb Guide

Dropped kerbs in Warrington Borough Council: fee, who builds it and how to apply

Everything you need to apply for a dropped kerb (vehicle crossing) with Warrington Borough Council, from the council's own website. Last checked 4 October 2026.

Homeowner application feeNot publishedNo application fee published on Warrington's pages on 4 Oct 2026
Total council feesNot publishedNo other council fees published. Building it costs extra.
Who builds itCouncil or your contractorCouncil or your own qualified contractor
Decision timeWithin 28 days
Permission valid forWork within 6 months

Warrington: Apply for a dropped kerb

Who builds dropped kerbs in Warrington?

Warrington may be able to do the work for you, or you can ask for permission to drop or widen your kerb and then use your own contractor. Your contractor must apply for a Permit to Dig, hold at least £5 million public liability insurance and employ workers accredited under the New Roads and Street Works Act 1991.

How much does a dropped kerb cost in Warrington?

Homeowner application fee: Not published. Warrington doesn't publish a separate application fee. If it approves your request it sends a quotation for the work; the inspection costs for the own-contractor route are included in the Permit to Dig, whose price isn't published.

Building it: Warrington's indicative prices: 7 square metres £1457, 10 square metres £1970, 15 square metres £2823 (measure from the front of your property to the kerb edge in metres and multiply by 3.75). Extras: moving a lamppost £1500, removing a tree £600, moving an unlighted road sign £350, moving a lighted road sign £1000.

Estimate your total for Warrington with the calculator

Contractor requirements in Warrington

How to check street works cards and insurance before you hire: our guide to dropped kerb contractors.

How to apply in Warrington

  1. If you live on a classified (A, B or C) road, or possibly in a conservation area, get planning permission first.
  2. Apply online with a map, a photo, a dimensioned sketch, the owner's written permission (if needed) and any planning permission.
  3. Warrington inspects the area.
  4. If approved, it writes within 28 days with a quotation, valid for three months.
  5. Either pay the quotation, or use your own contractor, who must get a Permit to Dig first. The work must be completed within six months.

How long it takes

Size and siting rules

Ready to apply in Warrington?

Check your property qualifies and have everything ready, then apply on the council's own website.

Warrington: Apply for a dropped kerb Eligibility checker Printable checklist

Nearby councils

Dropped kerb guides

Sources (official, checked 4 October 2026)